Hydro power is the first source of renewable electricity in France and represents around 10% of the electricity that is used on the territory. Small hydroelectricity counts by itself around 2500 power stations with power going from 30kW to 10MW.

This means of renewable energy production has historically been our core business. Today we operate fourteen hydro power plants for a total power of 17MW and a production of more than 65GWh a year, which corresponds to the annual consumption of 16000 French homes.

 

 

2ème Article Hydro

22 avril 2018

  

 

COMPANY EXPRIENCE & HYDRO POWER 

 

We have highly been specialised in hydro power for 50 years and particularly in the high falls with a savoir-faire that enables us to manage the whole development, finance, building, and operation processes of a project. The company wishes to develop and improve new-generation electromechanical machines by sharing experiences and communicating on a regular basis with the suppliers and designers.

As the head of the company and thanks to his passion for his job, Jean CAYROL relentlessly works to hand down his experience to his co-workers and his children in order to maintain internal and complete mastery of the required skills. The company is attached to be vigilant all year long and to manage any possible issue thanks to permanently available teams.

The social head office is located in Savoie (73) where the main technical centre related to hydroelectric facilities is also settled. The company works on the whole French territory where its facilities are spread.




Articles Dernières réalisations

21 avril 2018

Discover our
  FACILITIES  

MONTARTIER

21 mai 2018
MONTARTIER has been the centre of our activity in Basse Maurienne since we bought it in 1973.
High-head power plant
Argentine
4 400 kW
Pelton
Learn more >

LA BALME

20 mai 2018
LA BALME power plant has just undergone a renewal of its equipment. It is located just near MONTARTIER hydro power plant.
High-head power plant
Argentine
3 000 kW
Pelton
Learn more >

SAINT LEGER

19 mai 2018
This power plant we renovated in 2000 offers great hydraulic performances.
High-head power plant
Saint Leger
1 000 kW
Pelton
Learn more >

ARCOCHET

18 mai 2018
ARCOCHET and MONTARTIER power plants are built in cascade which enable them to turbine a 1100m head.
High-head power plant
Argentine
1 250 kW
Pelton
Learn more >

CHRISTINE A

17 mai 2018
Hydro power facility in LA CHRISTINE, built in 1934 for PECHINEY-ÉLECTROMÉTALLURGIE 's energetic needs.
Low-head power plant
Argentine
1600 kW
Kaplan
Learn more >

CHRISTINE B

16 mai 2018
This site was created and commissioned in 2014. It received the second prize in the energetic optimisation category at the "Trophées de La Petite Hydro" .
Low-head power plant
Argentine
250 kw
Kaplan
Learn more >

LE MOULIN DE SAINT-THIBERY

15 mai 2018
This power plant is next to a XIIIth century corn mill and runs the waters of the Hérault River in a remarkable environment.
Low-head power plant
Saint Thibéry
800 kW
Kaplan
Learn more >

NOHEDES

14 mai 2018
The power plant is perfectly integrated in its environment. The artificial water impoundment is an important tourist attraction during the summer period.
High-head power plant
Nohèdes
700 kW
Pelton
Learn more >

LE MOULIN DE CASTAING

13 mai 2018
This hydro power plant is located in the middle of the Sauternais region.
Low-head power plant
Noaillan
330 kW
Kaplan
Learn more >

APAS

12 mai 2018
This efficient power plant underwent many renovation works and is actually under an environmental compliance project.
Low-head power plant
Saint Martory
1 800 kW
Kaplan
Learn more >

BARRETS

11 mai 2018
BARRETS power plant was built just upstream APAS in order to operate some of the pressure loss of the canal.
Low-head power plant
Saint Martory
400 kW
VLH
Learn more >

LE MOULIN DE L'ABBAYE

10 mai 2018
Hydroelectric power plant juxtaposed with
the Barrets power plant.
The new VLH turbine in service since summer 2019
makes it possible to optimize the energy recovery of the site.
Low-head power plant
Saint Martory
400 kW
VLH
Learn more >

SAINT CHAFFREY

9 mai 2018
This power plant was built in 1912 on the Guisan River and is going to be renovated.
Low-head power plant
Saint Chaffrey
500 kW
Kaplan