Created in 1967, our company has been turned to
  NEW ENERGIES FOR 3 GENERATIONS  

 

CAYROL INTERNATIONAL owns a French and European savoir-faire and a long experience in the production of natural renewable energy.

Renewable energies favour energetic autonomy by promoting the country’s natural resources.

Notre société 2

26 avril 2018

CAYROL INTERNATIONAL has developed essential skills through the years on an administrative and technical level, as well as environmentally speaking in order to be present on the whole development and building chain of the renewable energies projects. This specific aspect brings a competence that can’t be found everywhere in France and enables the company to respond to the technical and environmental issues during the production while managing the deadlines and costs.

By internally undertaking all the stages of design, building and operation, we can create reliable production tools that are perfectly suitable for each site.

CAYROL INTERNATIONAL also handles the operation of the assets and prepares the technical and administrative renewal of its facilities. We develop specific security processes for each power station in order to ensure an efficient and reliable maintenance.

Localisation des installations

26 avril 2018

  LOCATING OUR FACILITIES  

 

 

CAYROL INTERNATIONAL has many references in the hydro, solar and wind power.

 

All our currently running facilities are detailed on the following map.

 

Click on a power plant to view the details.

 

14 HYDRO POWER PLANTS

17 MW   |   65 GWH/YEAR

11 SOLAR POWER PLANTS

2,5 MW   |   3 GWH/YEAR

2 WIND FARMS

10 MW   |    25 GWH/YEAR

CHRISTINE A
Hydro power facility in LA CHRISTINE, built in 1934 for PECHINEY-ÉLECTROMÉTALLURGIE 's energetic needs.
Low-head power plant
Argentine
1600 kW
Kaplan
EN SAVOIR PLUS >
CHRISTINE B
This site was created and commissioned in 2014. It received the second prize in the energetic optimisation category at the "Trophées de La Petite Hydro" .
Low-head power plant
Argentine
250 kw
Kaplan
EN SAVOIR PLUS >
ARCOCHET
ARCOCHET and MONTARTIER power plants are built in cascade which enable them to turbine a 1100m head.
High-head power plant
Argentine
1 250 kW
Pelton
EN SAVOIR PLUS >
MONTARTIER
MONTARTIER has been the centre of our activity in Basse Maurienne since we bought it in 1973.
High-head power plant
Argentine
4 400 kW
Pelton
EN SAVOIR PLUS >
SAINT LEGER
This power plant we renovated in 2000 offers great hydraulic performances.
High-head power plant
Saint Leger
1 000 kW
Pelton
EN SAVOIR PLUS >
LA BALME
LA BALME power plant has just undergone a renewal of its equipment. It is located just near MONTARTIER hydro power plant.
High-head power plant
Argentine
3 000 kW
Pelton
EN SAVOIR PLUS >
LE MOULIN DE SAINT-THIBERY
This power plant is next to a XIIIth century corn mill and runs the waters of the Hérault River in a remarkable environment.
Low-head power plant
Saint Thibéry
800 kW
Kaplan
EN SAVOIR PLUS >
STAR SOLEIL
A perfect harmony between renewable energy and farming.
Shade houses
Saint Jean de Libron
1610 KVA
EN SAVOIR PLUS >
AGDE
A nice window for this electric-supply wholesaler.
Rooftop-integrated
Agde
90 KVA
EN SAVOIR PLUS >
PORTIRAGNES
Integration of a solar roof as a replacement of the old existing roofing.
Rooftop-integrated
Portiragnes
60 KVA
EN SAVOIR PLUS >
SAUVIAN
A lot of energy for this ULM fleet.
Rooftop-integrated
Sauvian
245 KVA
EN SAVOIR PLUS >
OLONZAC
A farming building that has recovered its splendour.
Rooftop-integrated
Olonzac
65 KVA
EN SAVOIR PLUS >
BIZANET
Building this solar power plant enabled the wine-growers' cooperative to benefit from a complete renewal of its roofing.
Rooftop-integrated
Bizanet
216 KVA
EN SAVOIR PLUS >
CABESTANY
A different service activity.
Rooftop-integrated
Cabestany
72 KVA
EN SAVOIR PLUS >
TOULOUGES
It was clear right from the designing of this new industrial building that solar energy had its role to play.
Rooftop-integrated
Toulouges
74 KVA
EN SAVOIR PLUS >
LA RIXOUSE
This power plant is undergoing real change and its power will reach 250kW.
Low-head power plant
La Rixouse
250 kW
Kaplan
EN SAVOIR PLUS >
SAINT CHAFFREY
This power plant was built in 1912 on the Guisan River and is going to be renovated.
Low-head power plant
Saint Chaffrey
500 kW
Kaplan
EN SAVOIR PLUS >
CAMPS-LA-SOURCE
This project has brought new dynamics to the farming activities that are settled there.
Rooftop-integrated
Camps-La-Source
135 KVA
EN SAVOIR PLUS >
LE MOULIN DE CASTAING
This hydro power plant is located in the middle of the Sauternais region.
Low-head power plant
Noaillan
330 kW
Kaplan
EN SAVOIR PLUS >
APAS
This efficient power plant underwent many renovation works and is actually under an environmental compliance project.
Low-head power plant
Saint Martory
1 800 kW
Kaplan
EN SAVOIR PLUS >
BARRETS
BARRETS power plant was built just upstream APAS in order to operate some of the pressure loss of the canal.
Low-head power plant
Saint Martory
400 kW
VLH
EN SAVOIR PLUS >
LE MOULIN DE L'ABBAYE
Hydroelectric power plant juxtaposed with the Barrets power plant. The new VLH turbine in service since summer 2019 makes it possible to optimize the energy recovery of the site.
Low-head power plant
Saint Martory
400 kW
VLH
EN SAVOIR PLUS >
NOHEDES
The power plant is perfectly integrated in its environment. The artificial water impoundment is an important tourist attraction during the summer period.
High-head power plant
Nohèdes
700 kW
Pelton
EN SAVOIR PLUS >
SHIPYARD NOHEDES - PENSTOCK PIPE
Replacement of a section of Ø400 penstock over a distance of 450m. WORKS SUMMER 2019
High-head power plant
Nohèdes
700 kw
Pelton
EN SAVOIR PLUS >
SHIPYARD ST CHAFFREY - REHABILITATION
New developments have been designed taking into account environmental issues and sports activities on this river. WORKS 2019-2020
Low-head power plant
Saint chaffrey
500kW
Kaplan
EN SAVOIR PLUS >
WIND ENERGY COMMISSIONING
This was our company's first experience in wind energy.
Wind
Migré
10 MW
EN SAVOIR PLUS >
LA COMBE
A good way to use both hydro and solar power.
Rooftop-integrated
Argentine
56 kVA
EN SAVOIR PLUS >
MIGRE
A wind farm with five 2MW wind turbines.
Wind
Migré
10 MW
EN SAVOIR PLUS >
COULOURS
The Pays d’Othe 's park Coulours (89 - Yonne department) Nine V90 wind turbines : 10MW
Wind
Coulours
10 MW
EN SAVOIR PLUS >
La Chambre
Modernization of an industrial building very well received by the municipality.
Rooftop integrated
La Chambre
100 KVA
EN SAVOIR PLUS >

Notre entreprise

26 avril 2018

Our company
  IN A FEW DATES  

1967 Léonce Cayrol

26 avril 2018



Léonce Cayrol creates the hydroelectric firm in RABASTENS in the Tarn department (81). He equips an old lock with an 800kW turbine he found on a site in Alsace. The André Laroque de Castres institutions made the civil engineering.

1973 11 Janvier

26 avril 2018

 

On January 11 he participates to the auctioning of the MIZGIER factories. Léonce Cayrol is then declared successful bidder and purchases the Montartier site (4500 KW) and the La Balme site (750 KW), which were in ruins. In the same time he creates the hydroelectric company CAYROL & COMPAGNIE and names Jean Cayrol as its manager. They begin renovating the Montartier power plant that they will end in 1976, followed by La Balme in 1979 where they will increase the power by 400%.

1979 achat site APAS

26 avril 2018

 

The company buys the APAS site in SAINT-MARTORY (31) , former home to the Sirven paper mills. Many stages will complete the renovation like the creation of an adjoining production site in 1993 and the complete renovation of the hydraulic edges in 2010. In 2009, one of the first fish-friendly VLH turbines was built in the canal in order to use the charge loss to create an intermediary fall.

1983 moulin st thibery

26 avril 2018



The company buys the SAINT-THIBERY (34) corn mill that was built during the XIII century. The license will be effective in 1987 and there will be a two-years restoration work before its commissioning in 1989.

1984 creation cayrol international

26 avril 2018




CAYROL INTERNATIONAL is created to increase and promote the company abroad.

1991 construction entraygues

26 avril 2018

 



We build the well-type hydro power plant of ENTRAYGUES-SUR-TRUYERE (12) with three 600kW turbines.

1999 st leger

26 avril 2018

 


During this year the company will buy the SAINT LEGER (73) power plant but also power plants of the Mill, the Island and the Lock in FROUARD (54) and finally a last one in MERLE (81) which was sold again after its renovation.

2009 arcochet

24 avril 2018

  



We build the hydro power plant in ARCOCHET (73). We buy and renovate the hydro power plant in NOHEDES (66).

2010 photovoltaiques

23 avril 2018

 



We began building solar power plants for three years.

2011 castaing

22 avril 2018

  



We buy and renovate the CASTAING mill in GIRONDE (33).

2012 arcochet et christine

21 avril 2018

 

ARCOCHET power plant is put into operation. We buy the CHRISTINE power plant that was built in 1935 for PEYCHINET ELECTROMETALLURGIE ‘s energetic needs. Three years will be needed to bring the site back its beauty and industrial heritage. A power plant running the flow that is dedicated to the dam and a fish pass are created.

2016 eolien

20 avril 2018

 

 

 

 

We operate our first wind power site.